Ιδρυματικό Αποθετήριο
Πολυτεχνείο Κρήτης
EN  |  EL

Αναζήτηση

Πλοήγηση

Ο Χώρος μου

Visual understanding industrial workflows under uncertainty on distributed service oriented architectures

Matsatsinis Nikolaos, Doulamis, Anastasios

Πλήρης Εγγραφή


URI: http://purl.tuc.gr/dl/dias/EDD698C2-B26E-4BFD-A0F1-46B60594396B
Έτος 2012
Τύπος Δημοσίευση σε Περιοδικό με Κριτές
Άδεια Χρήσης
Λεπτομέρειες
Βιβλιογραφική Αναφορά A. Doulamis, N. Matsatsinis ," Visual understanding industrial workflows under uncertainty on distributed service oriented architectures," Future Gen. Computer Syst.,vol. 28 ,no.3 , pp. 605-617,Mar. 2012.doi:10.1016/j.future.2011.02.008 https://doi.org/10.1016/j.future.2011.02.008
Εμφανίζεται στις Συλλογές

Περίληψη

Service Oriented Architecture (SOA) is an evolution of distributed computing based on the request/reply design paradigm for synchronous and asynchronous applications. In such architectures, application developers or system integrators can build scenarios by composing one or more services without knowing the services’ underlying implementations. In this paper, we adopt a SOA framework for on-line scheduling complex industrial workflows. The proposed SOA consists of three main layers; the input layer, the benchmarking layer, the prediction layer and the scheduler. The main innovation of our SOA architecture is the prediction layer that supports computer vision tools able to visually observe how an industrial workflow is actually executed. This way, we can automatically estimate the actual execution time for a process. In particular a new self-initialized visual tracker algorithm is proposed in this paper to robustly trace workers’ trajectory in a plant via visual observations. Then, part-to-whole curve matching is presented so as to find correspondences among the traced curve and the ideal one and thus improving scheduler efficiency. The input layer interoperably describes industrial operations using the XPDL (an XML-based) format. The benchmarker evaluates much faster than real-time and in an off-line mode how long it takes for an industrial workflow to be executed on a given resource guaranteeing an almost real-time implementation of the video processing algorithms on the plant. The last component of the proposed SOA is the scheduler with the goal to assign the workflows to the available resources. In this paper, a Maximum Benefit First (MBF) scheduler is presented which maximizes the total gain received by the industry when completing execution of all the beneficial operations with minimum violations of their delivery deadlines (that is with the minimum compensations). Experiments have been conducted on a real-world industrial plant of Nissan Iberica automobile construction indicating the efficiency of the proposed system.

Υπηρεσίες

Στατιστικά